What is epoxy floor paint? How much does epoxy floor paint cost per kilogram?

First, let’s take a look at the performance characteristics of epoxy floor paint: It is composed of epoxy resin and curing agent, with strong adhesion, seamless wear resistance, impact resistance, acid and alkali resistance, oil resistance, dust and mildew resistance, waterproof and non-slip, and can withstand long-term crushing by 30-ton cars and forklifts.

Epoxy floor paint has a wide range of uses, such as:

  1. Factory workshops and assembly lines
  2. Underground parking lots
  3. School courts, basketball courts
  4. Exhibition halls, exhibition centers
  5. Swimming pool floor paint, amusement park floor paint
  6. Offices, laboratories
  7. Large supermarkets, kindergartens

The floor of a clean workshop uses a whole polymer surface layer of this type of paint, called epoxy floor paint, the main components of which are epoxy resin and curing agent.

The price of epoxy floor paint varies according to different manufacturers and brands. Generally, one kilogram of new floor can be painted 5-6 square meters once. One kilogram is equal to one kilogram. For new floors, the general air consumption of primer is about 0.12kg/m²; the middle coating is 0.25kg/m², and the epoxy topcoat paint consumption is 0.25kg/m² (two times back and forth). For the ground or the ground with sand, gray and cracks, the paint consumption will be large, especially the primer.

After the floor is polished and cleaned, high-efficiency epoxy primer is applied, and the immersion operation is adopted, and the paint consumption is more than 0.4kg/m². Therefore, it is not possible to say how much one kilogram of floor paint can do. It depends on the floor and the user’s requirements, so that the process and quotation can be determined. Extended information:

Epoxy floor paint is a high-value, high-quality, and high-demand product. The correct use method can keep the floor as new and prolong its service life.

Specific suggestions are as follows:

  1. After the construction of the floor is completed, it needs to be maintained for 7-10 days before it can be put into use. During the maintenance period, water or other solutions should be avoided from soaking the surface
  2. All employees entering the workshop must change into rubber-soled shoes (black-soled shoes with foam soles are not allowed) (so as not to bring mud and sand from outside into the workshop and scratch the floor)
  3. All hardware:
    such as iron chairs, iron tables and iron shelves, etc., must be wrapped with soft plastic, rubber or padded with cardboard to avoid scratching the floor during use
  4. The tractor needs to fully lift the machine board off the ground. When turning, please pay special attention to the machine board corners and do not scratch the ground
  5. When cleaning the floor, please use a soft mop with good water absorption or a wet and dry vacuum cleaner. It can be cleaned with clean water or detergent, but please pay attention to the slippery floor
  6. If it is worn or scratched due to long-term use, small areas can be repaired locally. If the area is large, it is recommended to re-roll it
  7. Before the equipment enters the factory, place a cardboard box on the floor to prevent scratches on the floor during transportation.
  8. Please use hard or elastic rubber wheels for carts and pallet trucks, and use them separately inside and outside the factory.
  9. Waxing can be done according to the requirements of the floor (the effect can prevent scratches on the floor)